
Artsakh has lost HPPs with an installed capacity of 112.5 MW
13 Jan 2021
After the war Artsakh loses 112.5 MW hydropower plants
read more13 Jan 2021
After the war Artsakh loses 112.5 MW hydropower plants
read more26 Nov 2020
"Energy for Secure Future"
read more03 Jul 2020
On July 1, Luiza Vardanyan was appointed General Director of the Foundation
read more16 Apr 2020
The zero rate will be valid until December 31, 2021
read more